
PROJECT HIGHLIGHTS
Committed to Service
LOUIS VUITTON, FT. WORTH TX
The Challenge
The Louis Vuitton store located in the Clearfork shopping center in Ft Worth TX completed in August 2017. This 4,000 SF was a welcomed challenge as we believe that projects that test our employees and their problem-solving only make us better equipped to take on any project.


THE DETAILS
Importance to the small things
What made this project different from others in the past, is the extreme importance to details. Each centimeter was measured and remeasured to affirm ceiling heights throughout the whole sales space. Each cut into the hard ceiling needed to be precise and the hard ceiling itself could not have an imperfection. The company, with its prestige of being meticulous to details in their products, needed a store that reflected those values. 911 Construction along with the general contractor and other subs are proud to present a store that accomplished just that.
TEAMWORK
Commitment to Quality
This is a great example of the kind of service our clients have come to expect from 911 Construction Co. LLC. We strive to better our projects and ourselves in every aspect. We work better as a team and together we make sure the client is more than satisfied with the finished outcome.


NAUTILUS HYOSUNG
911 Contruction Company tackled Nautilus Hyosung's 34,000 SF warehouse in Las Colinas. All of the framing, ceilings, drywall, paint, and concrete floor sealant was performed by us to the highest standard.
ACCURATE
How to finish a job quick and get it right.
When first working on this project, time and precision were of the essence as they needed to start production of their products as quickly as possible. This is where we specialize. We use all of our resources to minimize errors and forecast any delays. This allows us to stay on track and gives our clients the peace of mind that their investment is well taken care of.


OUR WORK
CLEAN, CONCISE, AND DONE RIGHT.